9818161122

DLF Capital Greens Phase I Specification

Floors
Living/Dining/Passage & Lobby within Apartment Vetrified tiles
Kitchen & Toilets Anti Skid Ceramic Tiles
Bedrooms Laminated Wooden Flooring
Balcony Terazzo Tiles / Ceramic Tiles
Walls
Living/ Dining/ Bedrooms/ Passage & Lobby within Apartment
Acrylic emulsion
Kitchen & Toilets Combination of ceramic tiles, oil bound distemper and/or Mirror
Ceilings
Ceilings Oil Bound Distemper
Counters
Toilets & Kitchen Counters in Marble / Granite
Fittings / Fixtures
Toilets & Kitchen Single Lever CP fittings, White Chinaware. Tower Rail / Ring (No bath tubs). Stainless Steel Double bowl, single drain board kitchen sink.
Study Room
Floor Terrazo / Ceramic Tiles
Walls Oil Bound Distemper
Ceiling Oil Bound Distemper
Doors & Windows
Internal Doors

Polished / Painted frames made of Hardwood Entrance door- Teak veneered & polished shutter / Moulded skin door. Internal door – Painted flush shutters / moulded skin door.
External Glazings Powder coated Aluminium
Electricals
Modular type switches & sockets, copper wiring (fittings like fans, light fixtures, geysers, appliances etc. not provided). Back-up power not exceeding 6 KVA (for Apartments upto area 1450 sq.ft.) and not exceeding 7 KVA (for apartments upto area of 1600 sq.ft.) in area.
Security System
Proximity Card Access Control, CCTV for Basement parking and Entrance lobby at Ground Floor. Boom barriers at entry & exit of the complex and at entry & exit of the basement parking
Facility Centre
Air-conditioned : Party Room, Gymnasium, Restaurant, Multi-purpose Hall and Banquet Hall. Swimming Pool, Change Rooms and Dispensary. Convenient Shopping Centre, Indoor Games – Card Rooms, Pool. Reading Lounge, Community Space for Elderly Citizens.

GET IN TOUCH WITH US !
102950